Comparison of three scheduling methods for a batch process with a recycle

J. Heinonen*, F. Pettersson

*Tämän työn vastaava kirjoittaja

Tutkimustuotos: Artikkeli kirjassa/raportissa/konferenssijulkaisussaLukuTieteellinenvertaisarvioitu

Abstrakti

A short term scheduling problem from an industrial case is modelled in three different ways. A discretized MILP-model, a heuristic approach and a genetic algorithm are tested. The scheduling task is complicated by a recycle connection. Storage capacity for raw materials and intermediates are restricted. Some productions steps are operated continuously and some in batch mode. A one-week schedule and a two-week schedule are constructed with different models and compared with industrial results. The genetic algorithm outperforms the other approaches, though the computational efforts are larger.

AlkuperäiskieliEnglanti
OtsikkoComputer Aided Chemical Engineering
KustantajaElsevier
Sivut679-684
Sivumäärä6
Vuosikerta10
PainosC
DOI - pysyväislinkit
TilaJulkaistu - 2002
OKM-julkaisutyyppiA3 Kirjan osa tai toinen tutkimuskirja

Julkaisusarja

NimiComputer Aided Chemical Engineering
NumeroC
Vuosikerta10
ISSN (painettu)1570-7946

Sormenjälki

Sukella tutkimusaiheisiin 'Comparison of three scheduling methods for a batch process with a recycle'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.

Viittausmuodot