Abstrakti
A genetic algorithm is used to calculate production schedules for a specific type of batch-mode manufacturing process. Previous scheduling efforts included both time discretised MILP as well as continuous-time MILP, both of which were outperformed by the GA when measured in calculation times and final schedule accuracy. The approach is two-folded and an algorithm to reproduce it on similar processes is presented.
| Alkuperäiskieli | Englanti |
|---|---|
| Otsikko | The 2003 Congress on Evolutionary Computation, 2003. CEC '03 |
| Kustantaja | IEEE |
| Sivut | 966-970 |
| Sivumäärä | 5 |
| ISBN (painettu) | 0-7803-7804-0 |
| DOI - pysyväislinkit | |
| Tila | Julkaistu - 2003 |
| OKM-julkaisutyyppi | A4 Artikkeli konferenssijulkaisuussa |
| Tapahtuma | 2003 Congress on Evolutionary Computation, CEC 2003 - Canberra, ACT, Australia Kesto: 8 jouluk. 2003 → 12 jouluk. 2003 |
Konferenssi
| Konferenssi | 2003 Congress on Evolutionary Computation, CEC 2003 |
|---|---|
| Maa/Alue | Australia |
| Kaupunki | Canberra, ACT |
| Ajanjakso | 08/12/03 → 12/12/03 |
Sormenjälki
Sukella tutkimusaiheisiin 'Scheduling a specific type of batch process with evolutionary computation'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.Viittausmuodot
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver