Scheduling a specific type of batch process with evolutionary computation

Jukka Heinonen, Frank Pettersson

Tutkimustuotos: Konferenssiin myötävaikuttaminenTutkielmavertaisarvioitu

6 Sitaatiot (Scopus)

Abstrakti

A genetic algorithm is used to calculate production schedules for a specific type of batch-mode manufacturing process. Previous scheduling efforts included both time discretised MILP as well as continuous-time MILP, both of which were outperformed by the GA when measured in calculation times and final schedule accuracy. The approach is two-folded and an algorithm to reproduce it on similar processes is presented.

AlkuperäiskieliEnglanti
Sivut966-970
Sivumäärä5
DOI - pysyväislinkit
TilaJulkaistu - 2003
OKM-julkaisutyyppiO2 Other
Tapahtuma2003 Congress on Evolutionary Computation, CEC 2003 - Canberra, ACT, Australia
Kesto: 8 joulukuuta 200312 joulukuuta 2003

Konferenssi

Konferenssi2003 Congress on Evolutionary Computation, CEC 2003
MaaAustralia
KaupunkiCanberra, ACT
Ajanjakso08/12/0312/12/03

Sormenjälki Sukella tutkimusaiheisiin 'Scheduling a specific type of batch process with evolutionary computation'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.

Viittausmuodot