Abstract
Steelmaking is an energy intensive industrial sector and being largely coal-based it gives rise to 5-6 % of the global CO2 emissions. Energy use for producing one ton of crude steel has been reduced by 50% since 1975, but the annual production rate of crude steel has been increasing more strongly. Since 2002, the production rate has increased by almost 80% amounting to 1510 Mt in 2012, and this trend seems to continue in the future. Therefore, making the iron production itself more efficient is not enough to reduce carbon dioxide emissions. A possible remedy is to replace part of the fossil reductants by renewables and to optimize the entire production chain from ores to steel, allowing more beneficial resource allocation in the processes involved. The present study focuses on the use of biomass as auxiliary reductant in the blast furnace, also paying attention to the effect of the introduction on the material and energy flows of the whole steel plant using a simulation model. Substituting part of the fossil coke or injected hydrocarbon by biomass may result in reduced fossil carbon dioxide emissions, as long as the biomass is harvested, transported and pre-processed in a sustainable way. As the biomass may need upgrading before it is used, a torrefaction model is included in the steel plant model. Results are presented from studies where the entire system is optimized with respect to costs, considering a penalty for CO2 emissions.
Original language | Undefined/Unknown |
---|---|
Title of host publication | International Congress on Energy Efficiency and Energy Related Materials (ENEFM 2013) |
Editors | Ahmet Yavuz Oral, Zehra Banu Bahsi, Mehmet Özer |
Publisher | Springer |
Pages | 33–41 |
ISBN (Electronic) | 978-3-319-05521-3 |
ISBN (Print) | 978-3-319-05520-6 |
DOIs | |
Publication status | Published - 2014 |
MoE publication type | A4 Article in a conference publication |
Event | conference; 2013-10-09; 2013-10-12 - Antalya, Turkey Duration: 9 Oct 2013 → 12 Oct 2013 |